Energy Completion Services has built the first “Rental Owned” 6 3/8 15K package on the market.
- Customer Flexibility
- API, SEPCO Certified
- All equipment sent out has onboard COC’s (Certificate of Conformance)
- All pressure control equipment is Integral
- 6 3/8″ 15KTriple Wireline Valve
- All Pressure Control Equipment has BV Stamp (Bureau Veritas) – highest certification available
- Reversal Flange 7 1/16″ 15K
- SEPCO Wireline Valve Rack
- Component Skid – used to transport subs, tools, etc…
- Skid is SEPCO Certified – meaning the skid is designed to hold the amount of weight its intended to
- Tools transported – Quick Test Sub, Tool Trap, Pump In Sub, Spreader Bar, Plug Valve, Night Cap, Lift Cap, Flanges
Energy Completion Services can increase efficiencies for your Deepwater Completion group in a number of ways:
- Multiple Wireline Vendors – Rig Down / Rig Up multiple BOP’s – Can Operate in both Eline and Slickline environments
- With ECS, you will be eliminating the need for multiple Pressure Control Packages
- 3rd Party Charges and Headaches
- Competitive and Flexible pricing (monthly or yearly)
Deepwater Hydraulic Connector
- 5 1/8″ 10K and 15K
- Tool that allows wireline to come on / off the well remotely
- Eliminates the need to manually disconnect from well
- Established a “red zone” around the well during wireline or coil tubing ops